Elledge WWTP - Regional Biosolids Drying Facility


Value: $25,000,000
Completed: 2008
Location: Winston Salem, NC
Owner: Winston-Salem/Forsyth County Utility Commission
Engineer: Black & Veatch
Summary: Wastewater Treatment Plant - Biosolids Drying Facility

Description: The project included the construction of a new 75’x150’x70’ tall Dryer Building and installation of Andritz sludge drying equipment. Also included in this project was an addition to the existing Dewatering Building, construction of a new truck scale and product silo structure, and the conversion of two existing digester tanks to Sludge Blending/Storage Tanks. This project was designed to dry the sludge from both the Elledge and Muddy Creek WWTP for more economical disposal by the owner.