Greensburg Water Quality Control Project
Value: $6,700,000Complete: 2003
Location: Greensburg, IN
Owner: City of Greensburg, IN
Engineer: HNTB
Summary: Wastewater Treatment Plant Improvements
Description: Expand and improve the existing wastewater treatment facility. Demolish Sludge Drying Beds. Modify Grit Building, Settling Tanks, Aeration Tanks, Oxidation Ditch, Intermediate Pump Station and Digesters. Construct Primary Sludge Pump Station, two 60' Primary Clarifiers, 60' Intermediate Clarifier, Flow Diversion Structure, 65' Final Clarifier, Return Sludge Pump Station, Waste Sludge Thickener, Ultraviolet Disinfection System, 60' Sludge Storage Tank, Sludge Loading Station, Intermediate RAS Pump Station, Equalization Basin Pump Station, and 2.5 acre Equalization Lagoon with HDPE liner.
